Activities 2006.08 LanKao Work Camp

From Architect HSIEH and Atelier-3

Jump to: navigation, search

2006.03-2006.08

蘭考春季&暑期工作營

Lankao Spring & Summer Work Camp 2006


2006年3月至至8月在賀村共举办春季、夏季3期工作营。其间共有各地的农民、学生等93名志愿者参与,对贺村展开持续的村落调研及地球屋(Earth House)003的建造与研究工作。

From March to August 2006 we have held three spring / summer work camps in He Village. During this period, there are 93 peasants and student volunteers participating in the village survey, the construction and research work of earth house 003.


1. 自制竹架楼板(Self-made bamboo planks)

2.室内粪尿分离厕所(indoor urine-faeces separation eco-toilet)

3.组立钢架(Assembled lightweight steel frame)

4.庭院设计(Courtyard design)

5.旧房测绘(Old house surveying and mapping)



兰考工作营

暑期工作營期間,進行舊房改造項目,向村民展示舊房再利用的可能性, 同時探索鄉村住宅的發展方向。

1.工作营全体成员

2.拆除屋顶瓦片

3.固定地梁

4.原外墙保留,内部组立钢架

5.保留原有墙体,双坡屋顶身高45公分。


Lankao work camp

During the summer work camp, we began the renovation project for showing the possibility of reusing old houses to the villagers. At the same time, we also explored the direction of rural house development.

1. Participants of the volunteer work camp

2. Taking down the roof tiles

3. Fixing the foundation beam

4. Keep the original external wall, installing steel frame inside

5. Keep the original wall body. The height of double-slope roof is 45 centimeters.


Personal tools
Languages 語文